RCM for the equipment that never gets an RCM.
Golden PM builds a reliability-centred PM program for ordinary plant equipment in days, not months of workshops, and delivers it ready to import into your CMMS. AI drafts. Engineers decide.
The problem
Everyone agrees RCM works. Almost no one can afford to run it.
Classical RCM treats every asset as an original piece of work: a facilitator, a cross-functional team, weeks of sessions, and a report written in prose that nobody can reuse on the next machine. So the conveyors, pumps, packaging machines and utilities that make up most of a plant never get analysed. They run on copied OEM lists or on nothing.
Golden PM does not cut corners on the RCM logic. It fixes the format of what an analysis produces, so the general work is done once for an equipment class and only the local work is done per asset.
Built on recognised standards
- ISO 14224: every failure mode is named from its code tables, not free text
- SAE JA1011 / JA1012: decision logic follows the RCM process and guidance they define
- MSG-3: task-selection logic adapted from it
Why it is faster
Speed comes from structure, not from skipping steps
No blank page
Analysts start from a fixed template and a library of Golden Tasks already written to a five-part standard: what, where, acceptance criterion, action if out of limits, and machine state.
No outside facilitator
Your own technicians and engineers, who know the equipment, run the analysis from the template. The structure carries the method.
One analysis, many assets
Identical and near-identical equipment inherits a validated analysis under stated conditions. Fix a criterion once and it updates everywhere it applies.
Every package passes a 60-item quality gate and sign-off before anything reaches your CMMS.
See it work
A complete program for one chain-driven conveyor
Sample on a fictional asset (CV-101). The tasks are real entries from the Golden Tasks library. No client data. Step through it below.
State what the conveyor must do, and to what standard
Functions are written with a performance standard in the operating context, so a functional failure has a clear meaning.
| Function | Performance standard |
|---|---|
| Move cases from the case erector to the palletizer | At least 30 cases per minute, no jams |
| Detect cases at the transfer point | Photo-eye signal on every case |
| Stop safely on demand | Drive stops when an E-stop is pressed |
Break the asset down, three levels and no deeper
Depth is capped at three levels. That bounds the analysis and keeps every package comparable with the next.
| Level 1 | Level 2 | Level 3 |
|---|---|---|
| CV-101 Case conveyor | Drive assembly | Gearmotor |
| Roller chain #60 | ||
| Sprockets | ||
| Conveyor section | Flange bearings | |
| Controls | Photo-eyes |
Classify every part by what it means for the decision
Each part is CRITICAL, STRATEGIC or CONSUMABLE. Parts that must be replaced together are bound by the Kit Rule. Missing data is flagged as a BLOCKER and resolved before the analysis goes on.
| Part | Class | Note |
|---|---|---|
| Gearmotor | CRITICAL | Failure stops the line; keep one spare |
| Roller chain #60 | STRATEGIC | Kit Rule: replace with both sprockets |
| Sprockets (drive and driven) | STRATEGIC | Kit Rule: replace with the chain |
| Flange bearings | STRATEGIC | Stocked, standard size |
| Photo-eye | CONSUMABLE | Stocked |
Name every failure mode from ISO 14224
Failure modes come from the ISO 14224 code tables, not free text. Each one is marked evident or hidden to operators, and its consequences are recorded in fixed fields.
| Component | Failure mode (ISO 14224) | Effect if nothing is done | Evident? | Consequence |
|---|---|---|---|---|
| Gearmotor | 2.7 Overheating | Motor trips, conveyor stops | Evident | Operational |
| Gearmotor | 1.2 Vibration | Bearing damage, then seizure | Evident | Operational |
| Roller chain #60 | 2.4 Wear | Chain elongates, jumps teeth and stops the drive | Evident | Operational |
| Sprockets | 1.3 Alignment/clearance | Side wear on chain and teeth | Evident | Operational |
| Flange bearings | 2.4 Wear | Noise, heat, then seizure | Evident | Operational |
| Photo-eyes | 3.3 Faulty signal/indication | Missed cases, jams at transfer | Evident | Operational |
RCM logic picks the task. The task library writes it.
Each failure mode gets a task type and an activity code. The task text below is copied word for word from the Golden Tasks library, exactly as it loads to the CMMS.
| Failure mode | Activity | Golden Task (as written in the library) | Every | Role |
|---|---|---|---|---|
| Chain wear | FVI | Roller Chain #60: Measure 16 pitches of this #60 chain. Replace if this length exceeds 12 3/8". Check for visible wear, stretching, misalignment, or signs of corrosion. Ensure the chain is correctly tensioned to prevent excessive wear or slippage. Listen for unusual sounds (grinding, squeaking), which could indicate improper alignment or lack of lubrication. Apply appropriate lubricant to the chain system. LIS H1-**-MI-150-CH | 4 weeks | T2 |
| Sprocket misalignment | INSPECTION | Sprockets: Examine sprocket condition. No burrs, deformation, hooked or missing teeth permitted. Inspect for misalignment of sprockets by looking for side wear on the sprockets, rock sprocket back and forth no play permitted. Clean the sprocket and chain to remove dirt, debris, or contaminants that may accelerate wear or cause corrosion. If side wear is detected Realign. Replace the sprocket if significant wear, cracks, or misalignment are detected | 13 weeks | T3 |
| Gearmotor overheating | OV | Gearmotor: Inspect bearings for wear, cracks, corrosion, and lubrication condition. Rotate manually to check for smooth operation and listen for unusual noises. Use ultrasound to detect early wear. Clean motor exterior, vents, and cooling fins for proper airflow. Monitor motor temperature, check connectors, cables, and shaft alignment. Lubricate bearings and check for contamination. Record operating temperature: _____, compare to standards. (– Maximum operating temperature for standard motors = 110° C.) Record amp readings at full load: _____ Amp Nameplate: _____ Amp If amps exceed nameplate rating, create WO for replacement. | 4 weeks | E1 |
| Gearmotor vibration | CMB VIB | Gearmotor: Conduct vibration analysis to detect misalignment or wear. Perform ultrasonic inspection on bearings to detect wear. | 4 weeks | T4 |
| Bearing wear | INSPECTION | Flange Bearing: Visually inspect the bearing for wear, misalignment, contamination, and proper lubrication. Check for noise or excessive vibration. Clean the surrounding area to remove dirt or debris that may enter the bearing. Rotate for smoothness, measure temperature. Record findings and replace if necessary. Grease bearings-use grease LIS H1-CS-MI-2-GR Ensure collar is securely fastened; tighten or replace if loosened. | 4 weeks | T2 |
| Photo-eye signal | CL | Photo-Eyes: Using a soft, damp rag wipe off the lenses and reflectors. | 4 weeks | O1 |
LIS code: lubricant identification by food-grade class, thickener, base oil, viscosity or NLGI grade, and application. H1-**-MI-150-CH reads as NSF H1, no thickener, mineral oil, ISO 150, chain drive.
Pass the quality gate, then load to the CMMS
The package is scored against a 60-item pass-or-fail checklist and signed off. Only then is it grouped into routes and written in the import format your CMMS expects. eMaint X5 is supported today.
| Route | Tasks | Est. time |
|---|---|---|
| O1 · every 4 weeks | Photo-eye cleaning on CV-101 and similar conveyors | 5 min per asset |
| T2 · every 4 weeks | Chain measurement and lubrication, flange bearings | 10 min per asset |
| E1 · every 4 weeks | Gearmotor operational verification | 20 min per asset |
| T4 · every 4 weeks | Vibration and ultrasound route | 20 min per asset |
| T3 · every 13 weeks | Sprocket inspection | 20 min per asset |
What you get
A program you can defend in an audit
- A PM program for each asset, with tasks, intervals, roles and step-by-step procedures
- The FMEA and task-selection record behind every task, traceable to its failure mode
- A growing task library your sites reuse on the next machine
- Import files formatted for your CMMS
Supported CMMS
eMaint X5 today.
More platforms are coming. Tell us which one you run: pilot demand decides what we support next.
Join the pilot
A small number of pilot sites
You provide manuals and an asset list for one line or area, plus someone to review the output. You get a working PM program at pilot pricing and a direct say in what we build next.
Prefer not to wait for the software? RAMS can build your PM program as a consulting engagement using the same method.
To apply, tell us
- Your name, company, role and site
- The CMMS you use
- Roughly how many assets are in scope
- Your biggest maintenance problem today
Questions
Is this real RCM?
Yes. The decision logic is the RCM logic of SAE JA1011, unchanged. What Golden PM adds is a fixed structure for recording it: bounded decomposition, ISO 14224 failure modes, a controlled task library and a quality gate.
What equipment is it for?
Non-complex equipment: conveyors, pumps, packaging machines and utilities, the bulk of a plant's asset list. Complex or safety-critical systems still deserve a full facilitated RCM analysis, which RAMS also delivers.
Does it replace our reliability engineer?
No. It removes the blank page and the formatting so your engineer spends time on decisions, not data entry.
What if our CMMS is not listed?
Tell us. Pilot demand decides which CMMS we support next.